Discussion:
[Fluxbox-users] change order of the apps in toolbar
Massimo Canonico
2011-12-21 12:54:04 UTC
Permalink
Hi,
I'm wondering if it is possible to drag&drop the app tab in the toolbar.
I need it since when I use two monitors, I would like to have the apps
tab in the screen where the app windows appear.

Thanks,
M
Mathias Gumz
2011-12-21 13:21:41 UTC
Permalink
hi,
Post by Massimo Canonico
I'm wondering if it is possible to drag&drop the app tab in the toolbar.
nope.

regards,
mathias
--
  [uid] mathias gumz [mail] akira at fluxbox dot org [pgp] 1024D/F6F6B18C
  [www] http://www.darkshed.net/ [irc] ak|ra (#fluxbox at freenode.org)
Continue reading on narkive:
Loading...